Close ×
Technical, Tariff & Financial Disclaimer
Interim Portal Notice: This website is an informational portal for PowerCube (www.SAPowerCube.com), operated by the CreoVision group of companies.
1. No Guarantee of Savings
Any references to electricity cost reductions, tariff arbitrage performance, or installation timelines (such as 3-day single-unit deployments) are indicative only. Actual financial savings depend entirely on site-specific load profiles, municipal or Eskom Time-of-Use (ToU) tariff structures, seasonal tariff periods, and formal engineering assessments.
2. Not a Backup Power System
The PowerCube Energy Storage System is engineered strictly for peak-shaving and tariff arbitrage. Unless explicitly contracted otherwise in a bespoke engineering specification, it does not provide uninterrupted power supply (UPS) or islanded backup power during load shedding or grid failures.
3. Permitting, Credit & Contractual Conditions
All deployments are subject to municipal/utility permitting and consents (whose direct costs are borne by the client), site technical feasibility, formal credit vetting (for PPA structures), and execution of definitive written agreements.
Leave a Reply